Plumbing systems
- Function
- Carries water to the fixtures that use it and takes waste away
- Site needs
- Access to the runs and a working supply and drainage connection
- Surveyed
- Route of the existing pipework, its condition and its sizing
One contractor across all three, instead of coordinating three trades around the same building.
Start a project
Each entry gives what the system does, what the building has to provide for it, and what is established on site.
Technical work starts with the property, not with a preselected package
Insulation, glazing and how airtight a building is set its heat demand. That figure, not the floor area, is what a heat pump has to be sized against.
Pipe sizing, emitters, the consumer unit and the incoming supply decide whether a system is replaced, extended or left in place. Those are four different jobs on the same property.
A heat pump and a photovoltaic array both land on the electrical supply, and on what the connection permits where the grid is involved. It is the constraint that most often changes a plan.
Only the second step needs access to the property.
Location, what is installed now, and what the new system has to do. Photographs of the existing plant, the emitters and the meter or consumer unit answer most of the first questions.
A site visit establishes what the rows above list as surveyed. What is in the job, and what is not, follows from what it finds.
Once the scope is clear, the installation can be planned around the site and the agreed project.
A single-member company working in the city and the surrounding area, for households and businesses alike. The registration details opposite can be checked against the Bulgarian Commercial Register.
Not always as they stand. A heat pump runs at a lower flow temperature than a gas or solid-fuel boiler, so the same radiator gives out less heat than it did before. Whether the existing emitters are enough depends on the heat demand of each room, which is why that is established before a system is specified rather than after.
South is the best case, but east and west generate too. The difference shows in the shape of the day rather than in whether the array works: an east and west split spreads output across morning and afternoon instead of concentrating it around midday. Shading across the day usually matters more than orientation does.
Mostly in sequencing. Heating and hot water are part of the plumbing, so those two are one job more often than not, and where an array goes in as well the electrical work happens once rather than twice. It changes the order of the work, not the specification: each system is still sized on its own.